Preparation before installation of a fully automatic calorimeter
The laboratory environment must meet the requirements.
2 Check whether the instrument configuration is complete according to the delivery list;
Prepare approximately 50 kilograms of distilled or deionized water.
Equipped with an analytical balance with a sensitivity of not less than 0.1mg and a suitable drying vessel;
5 Equipped with an oxygen cylinder, the oxygen and pressure in the cylinder should meet the requirements of the national standard; (electrolytic oxygen shall not be used)
6 Equipped with basic tools such as forceps, scissors, wrench, rose knife, pliers and corner spoon.
7. The full-time staff of Yinghua Company must be present to preside over the installation and debugging of the instrument. Otherwise, the user will be responsible for the adverse consequences;
8. When filling with water, care should be taken not to drop foreign objects such as fibers and wires into the inner cylinder to avoid instrument failure.
When installing the instrument, the chassis must be reliably grounded.